Three Reviewers, Three Different Instructions: How to Resolve Conflicting CAD Redlines

A drawing comes back with three different comments on the same wall. The architect wants the door moved. The mechanical engineer needs room to reach the equipment. The owner would rather use that space for something else. Each request makes sense. The problem is that following one could make another impossible.

When CAD redlines conflict, the drafting team needs one approved answer before changing the affected detail. Put the comments side by side, find out who has authority to decide and keep a record of the answer. Otherwise, someone ends up making a design decision they were never supposed to make.

Start with the comments that disagree

A marked-up drawing can look worse than it really is. Five people might leave notes on the same sheet, but that doesn’t mean five people are asking for different changes. Look at what each comment actually requests.

One reviewer might be fixing a room number. Another might be changing the door width. Those notes can usually be handled separately. But what if one reviewer wants a wall moved and another needs that wall to stay where it is? Now there’s a conflict.

Write down what each reviewer wants

Keep the original comments, then describe the disagreement in a sentence anyone on the project team can understand. Include the sheet number, location and people involved.

For example, instead of passing along two separate marked-up PDFs, write:

“Door 12 on A-204: architect requests an eastward move; mechanical reviewer says the current location is needed for equipment access.” That gives the project manager a clear question to work with.

Don’t assume the latest comment wins. A newer markup might have been made without the reviewer seeing an earlier instruction.

Which comments need a design decision?

A misspelled room name is usually a drafting correction. So is a detailed reference that needs to match an already approved drawing.

Changing a wall location is different.

The same goes for a ceiling height that affects ductwork or an opening that changes structural requirements. Those comments can affect design intent and need approval from the responsible professional.

At Brandywine CAD Design, our CAD BIM production services support drawing and model updates for AEC teams. The architect or engineer responsible for the design still makes the decisions that fall under their professional responsibility.

The drafter shouldn’t have to choose between two competing technical instructions.

Find out who can approve the change

This is where review meetings can get stuck. Everyone has an opinion, but nobody has been asked to give the final answer.

The project manager may need to bring people together

The person coordinating the drawings can send the question to the right reviewers. That doesn’t necessarily make them the person authorized to approve the design.

A structural opening may need the structural engineer’s decision. A door that interferes with mechanical equipment may require the architect and mechanical engineer to agree on the arrangement.

The owner’s preference matters, too. It just doesn’t replace the technical approval required for the change. If the approval roles aren’t clear, ask the project manager to identify them before the drawing is edited.

Ask a question someone can actually answer

A comment saying “Please coordinate with mechanical” leaves a lot of work for the next person. Give the reviewers the exact conflict instead.

For example:

“On A-204, moving Door 12 east would affect the mechanical access area shown on M-112. Should the door stay where it is, or will the equipment arrangement change? Please confirm the approved direction.”

Now the team knows which decision is holding up the work. Include a response date when the issue affects the drawing schedule. If the reviewers need more information, record what’s missing rather than assuming the change can go ahead.

Keep a record of the decisions

A comment-resolution log doesn’t need to be complicated. It needs to show what was requested, who can decide and whether the team has an answer.

Here’s an illustrative example. These are sample situations, not actual Brandywine CAD projects.

Drawing / issueReviewer commentsDecision ownerCurrent status
A-204 / Door 12Architect wants door moved; mechanical needs accessArchitect and mechanical engineerOpen: confirm clearance
A-301 / CeilingInterior reviewer requests 9 ft; mechanical needs a lower soffitArchitect and mechanical engineerWaiting for coordinated section
S-502 / OpeningArchitect requests wider opening; structural reviewer disagreesStructural engineerApproved: retain width

For an active project, include the comment IDs and dates. Add a reference to the written approval when a decision is made.

A reply doesn’t always mean the issue is closed.

Someone might respond with another question or ask for equipment information. In that case, the item stays open until the responsible reviewer gives an approved direction.

What happens when nobody has answered?

Sometimes a review meeting ends with one stubborn item still unresolved. Maybe the mechanical engineer needs equipment dimensions. Maybe the architect is waiting for the owner to confirm a layout preference. Don’t fill in the missing answer yourself.

Record who’s responsible for the next response and what information they’re waiting for. If the unresolved decision affects other drawings, make that clear to the project manager.

There should also be a cutoff for the next production update. Work that depends on an unanswered design question may need to wait.

One wording detail is easy to miss: “Consider moving the grille” is a suggestion. It isn’t an approved instruction to move it. Ask for the actual location or confirmation that the existing arrangement should remain.

Before drafting resumes, agree on one markup set

Once the reviewers have answered, check the decisions against the affected drawings.

A wall change on the floor plan might also affect a ceiling plan or equipment clearance. The coordinator needs to see whether the approved answer settles those related comments.

Make the approved instruction easy to identify

The production team should be able to open the agreed markup and understand which direction to follow.

Older instructions that no longer apply need to be marked as superseded. Otherwise, a drafter could work from a comment that the design team has already rejected.

Keep unresolved items separate from approved changes. That way, nobody mistakes an open question for permission to proceed.

Check these points before authorizing changes

  • Does every conflicting comment have an approved outcome or a clearly recorded open status?
  • Has the responsible architect or engineer approved changes affecting design intent?
  • Can the drafter identify which earlier instructions no longer apply?
  • Does the project manager know which work is still waiting on a decision?

If one of those answers is unclear, resolve it before releasing the affected work for production.

When outside drafting support is involved

The same process applies when firms use outsource drafting services.

An outside production team needs the approved direction for the work it has been assigned. Sending three competing instructions and expecting the drafter to sort them out creates an avoidable review problem. Our earlier article on drafting capacity covers the separate question of when firms may need additional production help.

At Brandywine CAD Design, we support CAD and BIM production while the responsible design team retains authority over design decisions.